Guidelines for installations: Interior wall across from front desk, Chace Center lobby, 1st floor

  • Installations can extend up to 12 inches from the wall
  • HVAC vents may not be blocked
  • No work may be suspended from the ceiling
  • No toxic materials, open flames, unsealed liquids (such as drinks), animals, organic matter (including wood, plants, or dirt), or edible materials will be permitted
  • Potentially flammable materials will be evaluated on a case-by-case basis to determine if alternative materials or fire retardants are required
  • Installations must comply with Americans with Disabilities Act Standards for Accessible Design requirements
2024 Dorner Location v_02.png

 

APPLY NOW